Vikki's Ten-Tec 1209 2m <-> 6m transverter Pix Page
TT-1209 main page
Click on pix for larger version.
Phase 4 through 7: Finish up the beast :-).
(1209 - Assembly 22; 22 to 42)
02/23-25/06 - (off and on)
(7 Hours 25 minutes; total: 18:15)
 | |
 | |
 | |
TT-1209 main page
Phase 3.0 C: 50 MHz and 144 MHz Receiving Amplifiers.
(1209 - Assembly 17; 17 to 21)
02/21/06 - 1815-2315 (off and on)
(1 Hour 30 minutes; total: 10:50)
 | |
 | |
 | |
TT-1209 main page
Phase 3.0 A&B: Q15 T-R Circuit, Q5 144 MHz Receive Post-amplifier.
(1209 - Assembly 14; 16 to 17)
02/20/06 - 1716-1815
(50 minutes; total: 9:20)
 | |
 | |
TT-1209 main page
Phase 2.0: T-R Voltage Control and RF Input Attenuator
(1209 - Assembly 10 to 13)
02/20/06 - 1800-2030 (off and on)
(2 hours; total: 8:30)
 | |
 | |
 | |
TT-1209 main page
Phase 1.0: 94 MHz Crystal Oscillator and Diode Mixer
(1209 - Assembly 6 to 9)
02/19/06 - 1630-2320 (off and on)
(3 hours; total: 6:30)
 | |
 | |
 | |
TT-1209 main page
Circuit Board Preparation Steps
(1209 - Assembly 5)
02/17/06 - 2250-2320
(30 minutes; total: 3:30)
 | |
 | |
TT-1209 main page
Parts Inventory and Organization
02/17/06 - 1856
(2 hours; Total: 3:00)
 | |
 | |
 | |
 | |
 | |
 | |
 | |
 | |
 | |
TT-1209 main page
Unpack - Start - Post Errata and Study The Manual
02/17/06 - 1258 (about an hour).
 | |
 | |
 | |
 | |
 | |
 | |
 | |
 | |
 | |
 | |
TT-1209 main page
Last Update: 02/17/2006